1 | Product specification stage | |
|
In Yongdan High-Tech to is it at the already existing product foundation , according to the needs of customer , make the design plan to create while being high, ask users to verify; Can contact the market department directly this stage; Suggestion that offer free conceptual design and can be implemented. |
| |
| |
|
2 | Principle design phase | |
|
Make the plan of researching and developing according
to the design plan, finish feasible test , confirm key technology and
device, make the product specification manual and ask users to verify;
Can contact the market department directly this stage, the sale engineer
of market department will discuss and make with the system engineer
of the research and development centre but implementing scheme according
to the case;
|
| |
| |
|
3 | Project design phase | |
|
Design the software , hardware, the project is tested, design and evaluate, adopt the conductive suggestion ; The engineering design content includes: Principle design of the hardware , PCB connect up , the software operating system transplanting , driver , using programming. The complete machine is installed and debugged, including assembling machine case , power . |
| |
| |
|
4 | Design authentication stage | |
|
Systematic stability test, finish the function to test,
EMC (electromagnetic and compatible ), put forward the suggestion for
revision;
|
| |
| |
|
5 | Test-manufacture preparatory stage | |
|
According to the specification of the sample , make
out the products of the short run ; Including in, it is other packaging,user
brand label , printed matter , batch stock , deliver not serving etc..
|
| |
| |
|
6 | The customer tests stage | |
|
The research and development centre cooperates with
OEM customer, carry on the technical support of different authentication
, carries on the test and modification of the whole system of the real
environment for use, until the customer is totally satisfied;
|
![]()
|